DFW NETWORK ACTIVE|8 Municipalities Monitored
90–180 DAYS AHEAD OF PERMITS
DFW SPECIALTY SUBCONTRACTOR PRE-PERMIT DOSSIER
3 PROOF PROJECTS UNLOCKED•24 CONFIDENTIAL DOSSIERS

Pre-Permit Commercial Roofing Projects Across Dallas–Fort Worth

Extracted directly from municipal Planning & Zoning agendas 90–180 days before building permits. Leads #1 through #3 are completely unlocked below with real Developer LLCs and Civil Engineers.

TERRITORY LOCK: 3 OF 5 DFW SEATS REMAINING
To protect client ROI and prevent bid saturation, we license each trade to max 5 contractors per metro.

Proof Dossiers (100% Unlocked For Inspection)

Site Plan ApprovalIndustrial

Oakdale IV Industrial

324 & 354 W Oakdale Rd
Gross Footprint
220,797 SF
Site Acreage
44.7 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Commercial single-ply TPO/membrane roof system with parapet wall coping for Oakdale IV Industrial.

Upstream Pre-Permit Decision Makers
Developer / Owner LLC
Listed on Staff Report
Civil Engineer / Architect
Pending Board Submittal
Site Plan ApprovalRetail

Costco Retail Sales

3650 W University Drive
Gross Footprint
—
Site Acreage
—
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Commercial single-ply TPO/membrane roof system with parapet wall coping for Costco Retail Sales.

Upstream Pre-Permit Decision Makers
Developer / Owner LLC
Listed on Staff Report
Civil Engineer / Architect
Pending Board Submittal
Specific Use PermitRestaurant

Drive-Through Restaurants (Burger King, Popeyes, Taco Bueno)

South Side of West University Drive, Approximately 280 Feet West of Aviation Way
Gross Footprint
—
Site Acreage
—
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Commercial single-ply TPO/membrane roof system with parapet wall coping for Drive-Through Restaurants (Burger King, Popeyes, Taco Bueno).

Upstream Pre-Permit Decision Makers
Developer / Owner LLC
Listed on Staff Report
Civil Engineer / Architect
Pending Board Submittal

Active DFW Pipeline (24 Confidential Projects Redacted)

Specific Use PermitHospitality

MK Venue Reception or Event Center

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
—
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Specific Use PermitIndustrial

Contractor Shop with Outside Storage

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
0.5 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

Oakdale IV Industrial

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
220,797 SF
Site Acreage
44.7 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Specific Use PermitIndustrial

Contractor Shop with Outside Storage

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
3,920 SF
Site Acreage
0.5 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 27, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Final PlatIndustrial

Division Substation Addition

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
6.2 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 26, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalMulti-Family

336-Unit Multi-Family Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
13.2 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 26, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
RezoningMulti-Family

2245 Carter Drive Multi-Family Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
5.9 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 26, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalMulti-Family

1630 South Pecan Multi-Family Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
2.6 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 26, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalHospitality

TUPPS Brewery & Entertainment Destination

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
—
Estimated Tier
$1M–$5M
Meeting Docket
OCT 22, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Preliminary PlatMulti-Family

Design and Development of Two City Owned Parcels

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
300.0 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 20, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Final PlatMulti-Family

Painted Tree Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
—
Estimated Tier
$1M–$5M
Meeting Docket
OCT 20, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

5050 Azle Avenue Storage Facility

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
10.9 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

Keller ISD Light Industrial Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
113.8 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalMulti-Family

Mixed-Use Development on Henderson Street

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
11.4 AC
Estimated Tier
$1M–$5M
Meeting Docket
OCT 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalMedical

Panther Creek East Addition Daycare Center

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
2.0 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalRestaurant

Frisco Original Donation Restaurants

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
0.2 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalRetail

Coit and 3537 Addition Retail Buildings

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
4.4 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalRetail

Dollar Flowers Addition Convenience Store

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
1.3 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalOffice

Cobb Farm West Office Addition

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
6.2 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalRetail

The Grove South Frisco

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
7.5 AC
Estimated Tier
$1M–$5M
Meeting Docket
APR 28, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
RezoningRetail

Legacy Drive Commercial Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
99.0 AC
Estimated Tier
$1M–$5M
Meeting Docket
FEB 2, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

Planned Development for Waste Transfer Station

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
5.0 AC
Estimated Tier
$1M–$5M
Meeting Docket
JAN 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

Light Industrial Development

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
6.1 AC
Estimated Tier
$1M–$5M
Meeting Docket
JAN 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]
Site Plan ApprovalIndustrial

Planned Development for Light Industrial

Locked Dossier
[CLASSIFIED — DFW SEAT REQUIRED]
Gross Footprint
—
Site Acreage
38.4 AC
Estimated Tier
$1M–$5M
Meeting Docket
JAN 14, 2026
ESTIMATOR SCOPE BRIEF & PLANNER NOTES

Verified trade scope note redacted. Claim your DFW trade seat to view full architectural submittal and concrete/signage/HVAC specifications.

Upstream Pre-Permit Decision Makers
Developer LLC / Owner
[CLASSIFIED — DFW SEAT REQUIRED]
Civil Engineering Firm
[CLASSIFIED — DFW SEAT REQUIRED]

Don't Wait For These 27 DFW Projects To Hit Building Permits

By the time a General Contractor is named on a commercial permit, bidding is already closed. Contact the Developer LLC and Civil Engineer while the project is in municipal review.